SECTOR - Highways / ROBs / RUBs
Bridge Projects
Mukesh & Associates carried-out consultancy services for numerous Bridges projects across India and the few are listed below.
List of Bridge Projects:
- Reconstructing the existing distressed steel bridge at Km 1/8 of Eraniel - Rajakkamangalam road across Pandi Vaikkal (29m).
- High level bridge across Kulithurai River (Thamarabarani River) at Ganapathiyarkadavu to a total length of 70.00m.
- High level bridge at km 10/2-4 Palayamkottai - Ambasamundram State Highway (SH-40) to a total length of 241.50m (15 spans of 16.1m each).
- High level bridge at km 32/6 Palayamkottai - Ambasamudram State Highway (SH-40) to a total length of 209.30m (13 spans of 16.1m each).
- High level bridge at km 5/10 Athiuthu - Surandai State Highway (SH-13) to a total length of 210.00m (14 spans of 15.00m each).
- Reconstructing the high level bridge at Km 4/4 of Padamathur – Thirupachetty road including improvements to approach (36m).
- High level PSC (Pre stressed concrete) bridge at km 38/2 of Parthibanur – Kamuthi State Highway (SH–47) to a total length of 252m
(9 spans of 28m). - High level bridge at km 5/6 Sivakasi – Kazhugumalai State Highway (SH-42) to a total length of 55.00m.
- Reconstructing the bridge at Km 28/8 of Udumalpet – Chinnar road (33m)
- High level bridge at km 19/6 of Kamanayakkampalayam - Annur State Highway (SH-89) to a total length of 48.00m.
- High level bridge across River Cauvery at km 3/2 of Kumarapalayam - Bhavani State Highway with 23 spans of 18.87m to a total length of 434m.
- High level bridge at km 6/6 of Kaveripattinam – Pochampalli State Highway 14 spans of 17.01m to a total length of 239m.
- High level bridge at km 1/10 of Salem bypass to a total length of 65m.
- High level bridge at km 31/6 of Salem – Ulundurpet on NH-68 to a total length of 60m.
- High level bridge at km 3/8 of Kaveripattinam – Kakangarai State Highway across river Pennaru with 13 spans of 17.01m to a total length of 221.13m.






