sector and services SERVICES / SECTOR
SECTOR - Highways / ROBs / RUBs

Bridge Projects

Mukesh & Associates carried-out consultancy services for numerous Bridges projects across India and the few are listed below.

List of Bridge Projects:

  1. Reconstructing the existing distressed steel bridge at Km 1/8 of Eraniel - Rajakkamangalam road across Pandi Vaikkal (29m).
  2. High level bridge across Kulithurai River (Thamarabarani River) at Ganapathiyarkadavu to a total length of 70.00m.
  3. High level bridge at km 10/2-4 Palayamkottai - Ambasamundram State Highway (SH-40) to a total length of 241.50m (15 spans of 16.1m each).
  4. High level bridge at km 32/6 Palayamkottai - Ambasamudram State Highway (SH-40) to a total length of 209.30m (13 spans of 16.1m each).
  5. High level bridge at km 5/10 Athiuthu - Surandai State Highway (SH-13) to a total length of 210.00m (14 spans of 15.00m each).
  6. Reconstructing the high level bridge at Km 4/4 of Padamathur – Thirupachetty road including improvements to approach (36m).
  7. High level PSC (Pre stressed concrete) bridge at km 38/2 of Parthibanur – Kamuthi State Highway (SH–47) to a total length of 252m
    (9 spans of 28m).
  8. High level bridge at km 5/6 Sivakasi – Kazhugumalai State Highway (SH-42) to a total length of 55.00m.
  9. Reconstructing the bridge at Km 28/8 of Udumalpet – Chinnar road (33m)
  10. High level bridge at km 19/6 of Kamanayakkampalayam - Annur State Highway (SH-89) to a total length of 48.00m.
  11. High level bridge across River Cauvery at km 3/2 of Kumarapalayam - Bhavani State Highway with 23 spans of 18.87m to a total length of 434m.
  12. High level bridge at km 6/6 of Kaveripattinam – Pochampalli State Highway 14 spans of 17.01m to a total length of 239m.
  13. High level bridge at km 1/10 of Salem bypass to a total length of 65m.
  14. High level bridge at km 31/6 of Salem – Ulundurpet on NH-68 to a total length of 60m.
  15. High level bridge at km 3/8 of Kaveripattinam – Kakangarai State Highway across river Pennaru with 13 spans of 17.01m to a total length of 221.13m.
Kaveripattinam BridgeBridge across River WorkROB Singaperumal KoilJN Goripalayam work
  • Kaveripattinam Bridge
  • Bridge across Cauvery River
  • ROB Singaperumal Koil
  • Junction improvement - Koripalayam
© 2009 Mukesh & Associates. All rights reserved.